New construction Commercial Services Gallery Service areas (517) 849-2376Request a bid
Drywall hang and finish

Board that goes
up right.

Drywall hung and finished on new homes and commercial builds across south Michigan.

Drywall hang and finish

Hung tight,
finished flat.

The hang decides how the finish turns out. Sheets run the right way, seams staggered and kept off door and window corners, screws set just below the paper. Then every joint gets taped and three coats of compound, sanded flat and ready for the painter.

This is the full drywall package on a new build, walls and ceilings, and it is how we do every new home and commercial interior we bid.

01

Hung square

Seams staggered, screws set clean.

02

Taped & coated

Three coats, feathered wide.

03

Ready for paint

Sanded to one flat plane.

What the walk-through finds

The finish is
in the mud.

Board goes up fast on any job. Whether your walk-through is clean or a punch list full of seams comes down to the part in the middle: the tape, the coats and the sand. That is where we spend the time, so your painter gets a flat wall and the buyer never sees a joint.

The hang
Half the job is screws

Board hung tight, square and fastened right, seams staggered and kept off door and window corners, screws set just below the paper. Rush the hang and every joint taped afterward is fighting a gap.

The mud
Three coats on every joint

Tape, then three coats of compound, each one wider and feathered past the last, dried and knocked down between coats. One heavy coat sanded thin is how joints end up showing through the paint.

The sand
Level 4 or level 5, to spec

Level 4 is the usual standard for walls getting flat paint. Where the plans call for level 5, or big windows and can lights throw light across a wall, the whole surface gets a skim coat so the painter lands on one even plane.

How a bid works

Plans in,
price back.

Send the plans, tell us the town and the dates, and we price the drywall. If the job fits our schedule, it goes on the calendar with your dates on it.

Request a bid
1

Send the plans

Email plans or a takeoff to mm_drywall@yahoo.com, or use the bid form. Include the town, rough square footage and when the job is ready for board.

2

Get the bid

Hanging, taping, finishing and texture priced from the plans, at the finish level you spec. If something on the plans is unclear, we ask before we price it.

3

Hang, tape, finish

On site on the dates we agreed. Board hung, joints taped and coated, sanded and textured, ready for paint.

4

Walk-through

We walk it with you or your super, close out the punch list, and leave the job broom clean for the painter.

Good to know

Builder questions,
answered.

Do you hang ceilings as well as walls?
Yes. Ceilings, walls, garages and lower levels, hung and finished as one job.
What is the difference between a level 4 and a level 5 finish?
Level 4 is tape, three coats of compound and a sand, the usual standard for walls getting flat paint. Level 5 adds a skim coat over the whole surface. It is worth it on walls that catch raking light from big windows or can lights, and on any wall the plans call out for it.
Why do new homes get nail pops and cracked corners?
New lumber dries and shrinks through its first heating season. Board fastened right, seams staggered off the corners and joints taped properly keep most of that off your warranty list.
What do you need to bid a job?
Plans are best. Email them to mm_drywall@yahoo.com with the town and when the job will be ready for board. No plans yet? Square footage and ceiling heights get you a rough number, and we firm it up from the plans.
M & M Dry Wall

Board the house.

(517) 849-2376
Jonesville, MI · Bids from plans
(517) 849-2376

Request a bid.

New home or commercial build? Tell us the town, the square footage and the timeline. Plans can go straight to mm_drywall@yahoo.com.

CallRequest a bid